It took 31 months to build Stade de France, the largest stadium in France that was build to host the soccer world cup in 1998. The stadium is used for sports…
18 grand staircases lead to the upper of 3 levels of seating areas. The middle level can be retracted to make room for the athletics track.
The 13000-ton roof is supported by 18 steel masts.
There are 177 private boxes in addition to a 400 sqm presidential box, used by the French President every year when s/he attends the final of the soccer French…
Each of the 2 giant screens is 200 sqm (playing area of a tennis court: 260 sqm).
Changing room.
Hallway from the changing rooms to the pitch.
Presidential box (middle, blue) and journalists area (grey seats) below the restaurant (top/windows).